Garland Logistics Center - Garland, Texas Hide Details
Garland Logistics Center
3800 Leon Road, Garland, TX 75041
Owner
IDI Gazeley, Dallas, Texas
Architect
Macgregor Associates Architects, Atlanta, Georgia
Project Highlights
494,000 total sf tiltwall building
96 – 9’x10′ Dock Doors
469 automobile spaces
54 trailer spaces
Multi-colored covered panels identify entrances and roof-mounted equipment is screened by the vertical articulations
Constructed utilizing the Ductilcrete Heidebed Concrete Slab System:
Comprised of a 3” Ductilcrete Topping over a double slip Sheet of poly, over 3” of unreinforced slab.
Benefits of saw joints only at the column line 50’ joint spacing.
4x less joint filling, curling, spalling and rocking over traditional 6” reinforced slab systems.
Heidebed system allows for Ductilcrete Slab to be completed after building erection and drying providing the benefits of a damage and stain free finished surface.